Snagging a new-build in Spain: what to check before completion and the guarantees that cover you

November 16, 2026 4 min read
Snagging a new-build in Spain: what to check before completion and the guarantees that cover you

In the third quarter of 2026, 34,611 new-build homes were registered as sold in Spain, 21% of all transactions, at an average 2,701 €/m², up 2.5% on the previous quarter and ahead of resale prices, according to the Property Registrars' quarterly statistics published in November 2026. A large share of those completions sits on the Costa del Sol, the Costa Blanca and in Murcia, where British and Irish buyers often collect the keys after a single one-hour visit. That visit, the snagging inspection, is the moment of greatest leverage in the whole purchase.

What the law guarantees, and what it does not

  • One year for finishing defects (paint, joinery, tiling, doors), payable by the builder. This is the guarantee most often lost: if you do not claim in writing before the first anniversary of handover, it expires.
  • Three years for defects affecting habitability: damp, thermal and acoustic insulation, water, electrical and air-conditioning installations.
  • Ten years for the structure (foundations, columns, beams, floor slabs), backed by the compulsory ten-year insurance. All three periods are set out in Article 17 of Law 38/1999 on Building Regulation (LOE). We explain what falls under each period and how to claim in new-build defects: what you can claim and the time limits.
  • What the law does not guarantee: that anyone checks the home for you. The developer hands over the Building Book and the first-occupation licence or responsible declaration, but no independent surveyor confirms that what was built matches what was promised.
  • If you bought off-plan, your stage payments must be covered by a bank guarantee or insurance (first additional provision of the LOE). Ask for the guarantee certificate before completion, not after.

The ten-point snag list

AreaWhat we checkCommon finding at recent handovers
Roof and terracesFalls, drains, waterproofing detailsStanding water after rain and overflow outlets leading nowhere
Façade and windowsSealants, closing and drainage of windows, shuttersWindows that do not close flush and unfinished sealing
DampThermal camera and moisture meter in bathrooms, kitchen and wallsConstruction moisture not dried out and leaking shower trays
InstallationsConsumer unit, RCDs, water pressure, heat pumpUnlabelled circuits and heat pumps never commissioned
FinishesFloors, tiling, paint, doors and wardrobesHollow tiles, lippage and doors that catch
Common areas and garageStorage room, parking space, entrance hall, communal poolGarage leaks and parking spaces smaller than promised
SpecificationWhat was installed against what the contract saysBrands and models swapped without notice

When to do it and how to get it in writing

Snagging should happen before you sign the deed, at the pre-completion visit the developer offers once the first-occupation licence is granted. Request that visit in writing and bring an independent surveyor: a report with photographs and measurements turns a verbal complaint into an annex the developer signs and undertakes to fix before handover or within an agreed period. If the developer refuses the list, the deed can be signed with part of the price retained or with the list recorded by the notary. Our architects have inspected more than 9,000 homes, and in new-builds most of the defects they find are the kind a buyer cannot see on a visit without instruments. For what we look at on key-handover day, see our guide to new-build inspections.

Revicasa carries out new-build snagging inspections anywhere in Spain with registered architects: more than 250 checkpoints, thermal imaging and moisture readings, and a report within 48 hours in the language you choose when booking (13 available). From 299 € for an apartment and 369 € for a villa. If we find no problems, we refund the fee (conditions apply).

Sources: Colegio de Registradores, Estadística Registral Inmobiliaria, third quarter of 2026 (November 2026); Law 38/1999 on Building Regulation (LOE), Article 17 and first additional provision; Instituto Nacional de Estadística, property transfer statistics, July 2026.

Cover photo: aerial view of Estepona. kallerna, CC BY-SA 4.0, via Wikimedia Commons.

Revicasa

Written by

Revicasa

Revicasa architects team

Architects who inspect homes every week and explain what you should know before buying, selling or renovating.

Ready to inspect your home?

Detect issues before buying and decide with objective information.

Schedule inspection
Let's talk

Tell us what you need
and we'll help you

Leave us your details and we'll contact you within 24 hours to answer your questions about your home inspection.