Back to blogBuying & selling

New-build defects in Spain: what you can claim and the time limits

November 16, 2026 7 min read
Render of a newly completed residential development: two apartment blocks with white facades, glass-balustrade terraces and a communal garden with olive trees and a pool

When I finish inspecting a newly handed-over home, the question I get asked most is not technical: "So who fixes this, and how long do I have to claim?". New-build defects have their own legal regime, different from that of a second-hand home, and knowing it changes how you act from day one. In this article I explain, as an architect, what you can claim, from whom and within what time limits, and the role of an inspection carried out right after you receive the keys.

I am not a lawyer and I do not try to replace one. What I do every day is identify the defect, reason out its likely cause and say which technical category it falls into. And that category is precisely what determines the time limit.

Which new-build defects you can claim

The reference law is Spain's Building Act (Ley de Ordenación de la Edificación, LOE, Law 38/1999). Article 17 does not set a single guarantee period but three, depending on the type of damage. The key is to classify each defect correctly:

  • Finishes (1 year). Damage caused by workmanship defects affecting finishing elements: hollow or badly laid tiles, defective paint, loose skirting boards, doors that rub, poorly finished sealing. The builder is liable for these.
  • Habitability (3 years). Damage caused by defects in building elements or services that breach the habitability requirements: hygiene and health, noise protection, energy saving and thermal insulation. This covers leaks, damp, condensation caused by poorly installed insulation or drainage that does not work properly.
  • Structure (10 years). Material damage caused by defects in the foundations, columns, beams, floor slabs, load-bearing walls or other structural elements that directly compromise the mechanical strength and stability of the building.

In practice, many defects sit on the borderline. A crack in a partition wall may be a simple finishing issue or the symptom of excessive deflection of the floor slab. A stain on the ceiling may be paint or a leak from the neighbour's terrace above. That is why it is not enough to describe what you see: you have to reason out the cause, because that decides whether the time limit is one, three or ten years.

Type of defectTypical examplesGuarantee period (LOE)When it usually shows up
FinishesHollow tiles, paint, interior doors that rub, sealing1 yearAt handover or in the first months of use
HabitabilityLeaks, damp, condensation, poor thermal or acoustic insulation, drainage3 yearsWith the first rains, the first winter or daily use
StructureCracks caused by slab movement, foundation settlement10 yearsOver time, as the building takes on load

Time limits for claiming new-build defects

This is the most common mistake: confusing the guarantee period with the deadline to claim. They are two different things.

  1. Guarantee period. This is the period within which the defect has to appear: one, three or ten years. Under article 17, it runs from the date of acceptance of the works, without reservations, or from when the reservations are remedied.
  2. Deadline to claim. Once the damage appears within that period, article 18 gives you two years to take action, counted from when the damage occurs.

There is a detail few buyers know: acceptance of the works is the act between the developer and the builder, not the day you receive the keys. There can be months between the two. If acceptance took place in March and you completed in September, the one-year period for finishes does not start in September. Ask for the date of the acceptance certificate (acta de recepción); it usually appears in the Building Logbook (Libro del Edificio) documentation the developer hands over.

My advice: do not wait for the year to be up before making a list. Report each defect in writing, with a date, as soon as you spot it, with photos, and keep the reply. An email with read receipt or a burofax leaves a record; a phone call to the after-sales service does not.

Hidden defects in a new build: what changes compared with a second-hand home

When people search for hidden defects in a new build, they usually think of the Spanish Civil Code remedy, the six-month one that applies to sales between private individuals. With a new home bought from a developer, on top of that route and of a claim for breach of contract, you have the specific protection of the LOE, which is broader and lasts longer. If yours is a second-hand home, we explain it in what to do if you discover a hidden defect after buying.

In a new build, what matters is not so much whether the defect was hidden as what type it is and when it appears. A defect you note on handover day can still be claimed, and it is much easier to claim when it has been documented from the start.

The LOE requires the developer of homes to take out ten-year insurance covering structural damage. Guarantees for the one- and three-year periods are provided for in the law but are not currently compulsory for housing, so in those cases the claim is made against the parties involved in the works. The developer is jointly liable with them, which is why it is the first recipient of your claim.

How to claim for defects in a new home, step by step

The order matters. This is the one I recommend to anyone who asks me after an inspection:

  1. Document the defect: dated photos, measurements if you have them and a clear description of where it is.
  2. Report it in writing to the developer and, if you know who it is, to the builder. Ask for a reply and a repair deadline.
  3. Keep a record of every after-sales visit: what was repaired, what was not and whether the repair tackles the cause or just the symptom.
  4. If there is no reply or the defect comes back, request a technical report that identifies the cause of the defect and its category under the LOE.
  5. If the dispute goes to court, that report must be an expert report meeting the requirements of the Civil Procedure Act. I explain the difference in expert report or home inspection.
  6. Speak to a lawyer before the two years from when the damage appeared run out.

The role of the inspection when you receive the keys

I carry out the new-build inspection right after the keys are handed over, with electricity and water already connected. That way I can test the services properly: run several taps at once, fill shower trays and check they drain, test the electrical installation and check that windows and doors close and seal. I explain the full walk-through in what I check when you get the keys.

In the report, each item checked is marked "defect" or "no defect", and in the comment I state the severity and what I observe. That gives you a dated list, with photos, that you can send to the developer the same day. It is the first proof that the defect existed at handover and an orderly starting point for the after-sales service to carry out repairs in stages.

The price is the same as for any inspection, depending on the type of home and its floor area: from €299 for a flat of up to 90 m². You can see the details in prices and the service in new-build inspection.

What a visual inspection cannot detect

I make this clear in every report. An inspection is non-destructive: I do not lift floors, open walls or take samples. So there are things I cannot see:

  • The condition of the reinforcement, the foundations or the inside of the floor slabs.
  • The waterproofing under the floor of terraces, roofs and bathrooms, unless there is already a leak that gives it away.
  • Concealed pipes and their joints, beyond what functional tests and the thermal camera reveal.
  • The real acoustic insulation between homes, which can only be measured with a specific test.
  • Defects that appear with use and over time: settlement, shrinkage cracks or condensation that only shows up in the cold of winter.

That is why the handover inspection does not close the matter. It is a snapshot of the condition of the home on the day you receive it. If something new appears in the following months, the LOE time limits are still running in your favour; what matters is to document it as soon as it appears and not to let the two years for claiming go by.

Iván Samaniego

Written by

Iván Samaniego

Registered architect (COAM) and co-founder of Revicasa

On the blog he shares what we learn on every inspection so you can decide with objective information.

Ready to inspect your home?

Detect issues before buying and decide with objective information.

Schedule inspection
Let's talk

Tell us what you need
and we'll help you

Leave us your details and we'll contact you within 24 hours to answer your questions about your home inspection.